You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
The project total costs sum up all tree-children, which is incorrect because the tree contains the .tf file and the resources/modules within the same .tf file.
In the screenshot, the google/apps/europe-west1/dev project should only say “$73.00” instead of “$146.00" (which is just double as the main.tf and the module are child elements of the project).
The text was updated successfully, but these errors were encountered:
Thanks all for reporting this, I believe the problem here is that we are showing costs for the different project usage of these files. So this is more a UX issue as we do not "show" the different project usage per resource/module, but rather sum it up. Which, is not very clear. The fix is to show which projects are associated with the resources/files rather than what we currently do.
The project total costs sum up all tree-children, which is incorrect because the tree contains the .tf file and the resources/modules within the same .tf file.
In the screenshot, the
google/apps/europe-west1/dev
project should only say “$73.00” instead of “$146.00" (which is just double as the main.tf and the module are child elements of the project).The text was updated successfully, but these errors were encountered: